Washington Flagger Lane Closure Traffic Control Plan

On a two-lane, two-way road you close one lane and flaggers alternate both directions through the single open lane. That is MUTCD TA-10, and it is the most common work-zone setup in the country. Below are the computed dimensions for Washington at four posted speeds — taper, advance sign spacing, buffer, and device count.

Real MUTCD dimensions, a title block, and a printable sheet — no account, no cost.

Build this plan free — takes about 2 minutes

Computed MUTCD dimensions

Governing typical application: TA-10 — Lane Closure on a Two-Lane Road Using Flaggers. Assumptions: urban collector, 2 through lanes, 12 ft lanes, 12 ft lateral offset, 100 ft work space, short-term duration. Rule set MUTCD 11th Ed. + 50-state/DC adoption layer + ID/ACHD profiles, rule set 2026-08 rev 4.

MUTCD 11th Edition Part 6 values computed by the TCP Builder engine.
Posted speedTaper length (one lane two way)Advance signs A / B / CLongitudinal bufferDevice spacing taper / tangentChannelizing devices
25 mph100 ft100 ft / 100 ft / 100 ft155 ft20 ft / 50 ft19
35 mph100 ft250 ft / 250 ft / 250 ft250 ft20 ft / 70 ft18
45 mph100 ft350 ft / 350 ft / 350 ft360 ft20 ft / 90 ft19
55 mph100 ft350 ft / 350 ft / 350 ft495 ft20 ft / 110 ft19

What applies in Washington

Agency rule set
State of Washington (MUTCD as adopted)
MUTCD adoption
National MUTCD adopted with a state supplement (cross-checked against a second source)

Printed on every Washington sheet:

  • Washington has adopted the National MUTCD with a state supplement; this sheet uses national default values — check the Washington supplement, which controls where it differs (supplement values not yet encoded in this rule set).

This rule set holds no Washington-specific permit form, review time, or closure-hour restriction, so none is shown. Those are set by whoever owns the road — state DOT, county, city, or highway district — and have to come from them.

Governing citation: Washington — MUTCD adoption recorded as: National MUTCD adopted with a state supplement. Bucket taken from secondary compilations of 11th-Edition state MUTCD adoption current to mid-2026; FHWA’s own state adoption listing was unreachable from the build environment and has not been checked directly. Cross-checked against a second independent source. Washington adopts the MUTCD with state modifications by rule (WAC 468-95). This rule set asserts no Washington-specific numeric requirement; adoption status best-effort — verify against FHWA’s state adoption listing (“MUTCD information by State”) and the state DOT before submittal.

Questions people actually ask

What does a flagger lane closure plan need in Washington?

The same Part 6 elements everywhere: advance warning signs at the table spacing for the setting and speed, a flagger symbol sign and a flagger station on each approach, a 100 ft one-lane two-way taper, a longitudinal buffer equal to the stopping sight distance, and channelizing devices at the tabulated spacing. Local requirements sit on top of that, not instead of it.

How many cones do I need?

The count in the table is what the geometry requires: taper devices at the taper spacing, tangent devices along the work space at the tangent spacing, plus the downstream termination. It scales with the length of your work space, so set the real length in the builder before you buy or load.

Do two flaggers need radios?

If they cannot see each other, they need a way to communicate — radios, a pilot car, or a traffic control signal. MUTCD does not let a flagger release traffic into a lane the other end has not cleared. Sight distance between stations is the thing to check before you set up.

Real MUTCD dimensions, a title block, and a printable sheet — no account, no cost.

Build this plan free — takes about 2 minutes

DISCLAIMER — READ BEFORE USE

This traffic control plan was generated by an automated tool for planning and reference purposes only. It is based on the MUTCD 11th Edition Part 6 typical applications and the agency rule set selected above. It is not a certified, sealed, or professionally engineered document and has not been reviewed against actual field conditions at this site. It must be reviewed, adapted to field conditions, and approved by a qualified person — and, where required, by the permitting agency and/or a licensed Professional Engineer — before use. Field conditions govern. The user is solely responsible for work-zone safety, for conformance with all applicable federal, state, and local requirements, and for obtaining all required permits. PM Axsus disclaims all liability arising from use of this document.